What Are The Stages of Floating System Parquet Application?

Floating Parquet Application System?

Floating Parquet Application System?

  • Decide the furnishing direction after laying humectants barrier and blanket. Start to furnish the first row after shaving short male edge then place the female edge towards the wall.
  • Measure the place which you will cut by laying male edge to the wall and putting one panel over previous one. Cut the panels 8 mm. shorter where they are coincided and adjust the last piece. Last piece shall not be shorter than 5cm.
  • Join the panels from their shorter edges after adjusting expansion gaps and mount the first row. Be very careful to panels follow vertically each other during this process. This is especially very important in first row. Spread the glue over inside part of female part.
  • Continue to next row by starting with the remaining part of last panel. Use plastic wedge to insert panels within each other.
  • Place the male edge towards the wall over the previous row while making the last row. Mark the distance by waste piece having complete width and by mark the last row by sliding this piece. Adjust the last row by cutting panels from this point. Assemble them with each other by spreading glue in same way. Use pulling iron for complete joining.
  • Of course do not forget to leave expansion gaps during installation of last row. After completely finishing the application remove the elements that you had used for adjusting expansion gap and assemble the skirting. Never fix skirting to parquets.